Western Port Water required electrical switchboard upgrade at two sewer pump stations on Phillip Island namely; Hayley Ave SPS and Potters Rd SPS. These stations were built many years ago and required upgrade to improve reliability and meet current standards.
Ace Electrical was appointed as the head contractor for this design, fabricate, supply and installation contract.
Ace Electrical was involved in the following scope of works:
Upgrade works carried out while maintaining continuity of pump stations operation in order to manage sewage flows during the Switchboard replacement works.