Quality Management
ISO 9001
Environmental Management
ISO 14001
OH&S Management
ISO 45001

Coopers Bridge Replacement

ProjectCoopers Bridge Replacement
LocationMeredith Vic
ClientGolden Plains Shire Council

Coopers Bridge Replacement

Cooper’s Bridge services mostly local traffic between Meredith and Steiglitz over the Moorabool River in Victoria. The original single lane, 3 span bridge was originally constructed in the 1930s and despite several small repair works was coming to the end of its service life, with a 20-ton load limit applied.

The new two lane, single span bridge removes the load limit and allows easier flowing traffic.

ACE Infrastructure as head contractor undertook all the structural elements of the bridge.

ACE Infrastructure was involved in the following scope of works:

  • Bored piles
  • Substructure
  • 4 no. 30 metre, 53 tonne pre-stressed super-T beams
  • Bridge railing 
  • Guard fence
Translate »